What size boat lift do I need?
Take the manufacturer's dry weight and add fuel, water, batteries, engines if they were listed separately, and the gear you keep aboard. The rated capacity should clear that loaded weight with room to spare. Our posted range runs from 10,000 to 16,000 lb on four-post units. If your hull calls for 20,000 lb or more, we price it after seeing the site, since the piles grow with the load.
Do boat lifts in Pasco County need their own permits?
Yes. Pasco's In-Water Construction Affidavit treats each in-water structure as its own permit, and lifts and canopies are both on that list. The electrical permit has to go in with the main permit unless the plans say NO ELECTRIC. Wiring that shows up later without a permit is a violation charged to the property owner.
Can I put a canopy over my lift in Hudson?
Yes, now you can, within Pasco's 2025 rules. The canopy has to sit over a vertical or cantilever lift, rise no more than 5 feet above it and 20 feet above mean high water, be open-sided fabric in a neutral color, and come down before a storm. You get one per property, and it needs its own permit. Covers put up without one were the subject of a 2021 WFTS investigation.
Can a new lift go on my existing dock pilings?
It can, as long as the piles are sound, tall enough and spaced for the new cradle. That job runs $12,000 to $18,000 in our range, compared with $18,000 to $28,000 for new pilings. In Pinellas, replacing a permitted lift needs no Water and Navigation permit unless pilings are replaced, so reusing good piles can mean less paperwork too.
Do I need a permit for a jet ski lift on Lake Keystone?
Yes. The Environmental Protection Commission of Hillsborough County says personal watercraft lifts, floating platforms and canopy covers over Hillsborough waters need review by its Wetlands Division. On Lake Keystone, the form is the Minor Work Permit Application. We check the lake frontage and file with EPC before any work starts.
How much water do I need under a lift on Lake Tarpon?
Pinellas Code Sec. 58-546 asks for at least 2.5 feet of water at the slip on Lake Tarpon, measured from ordinary low water, and 1.5 feet in canals. Each home gets one private dock with mooring for two boats. Open-sided covered lifts are fine, and new docks may not reach more than 100 feet from the ordinary high water line.
Is lift power priced separately?
Yes. Power for the unit carries its own electrical permit in Pasco and Port Richey, and Pinellas dock permits don't include electrical work. Our range for that electrical work is $3,000 to $5,000, depending on the distance from your panel and the controls you want. It shows up as its own line on the free written estimate, so you can see it apart from the lift.