Marine Contractors in Dunedin Start With the City, Then Pinellas
For marine contractors in Dunedin, the city goes first on every marine structure. Land Development Code 103-23.3.5 says all bulkheads, seawalls, retaining walls, docks, piers, floating docks, boat slips, boathouses and moorings have to be approved through the City of Dunedin permitting process, on written application to the zoning administrator. Every dock sits in the city's MP zoning district, which takes in each navigable waterway in town.
After the city signs off, LDC 103-23.3.6.2 calls for a separate application to the Pinellas County Water and Navigation Control Authority. That county office handles construction specs, dock repair permits, after-the-fact permits and dilapidated docks. Our seawall repair and construction page explains how we fix and build walls. The seawall and dock permit guide walks through the state and federal layers under both local reviews.




