How dock builders in Holiday measure one-third of the waterway
Holiday has no city hall, so dock builders in Holiday run every job through Pasco County Building Construction Services under the county's Land Development Code Sec. 1001, rewritten by Ord. 25-37 in August 2025. Sec. 1001.5.A sizes a residential build. No dock, structure, lift canopy or moored vessel, alone or combined, may project from the seawall or shoreline more than one-third of the waterway width, past the side-use lines, past the edge of a marked or unmarked channel, or so far that a canal's navigable channel drops below 12 feet. Width is measured at the narrowest point between opposing seawalls.
Try it on a 45 foot canal. One-third is 15 feet, and that 15 feet has to hold the dock and the beam of the boat beside it. If the neighbor across builds to the same limit, 15 feet of channel stays open, which clears the 12 foot minimum. Our dock building overview covers materials and lifts area-wide. For seawalls, flood zones and the neighborhoods along the river, read the Holiday marine contractor page.




